|
|

2 Graphical System (TOPX)
2.2 Rail Operation
2.2.1 Overview
A full rail planning system is included in TOPS. In the instance where the rail planning is an on-dock
operation, the rail planning component of the system runs on the same database as the marine terminal
operation. Where the rail management is a pure rail depot, the system runs on its own database structure. This
allows for flexibility in the system to run either stand-alone or as a combined marine/rail terminal
operation. The system is completely graphical and RDT’s are also supported by the EC system component.
2.2.3 Feature Summary
- Building wagon classes and
- rail wagons
- Setting up train geometry
- Train list view
- Train layout view
- Unloading arriving trains
- Building a departing train
- Planning a departing train – walking the train, shunting the train, creating WQ and various parameters,
viewing planned moves
- Planning from the load list
- Planning from yard stacks
- Undo planned moves
- Re-sequencing Work Instructions
- Print sequence sheets
- Printing train reports
And many more...

|